Description
Easily Transport Materials
The Maxiveyor provides an extremely fast and efficient way of removing rubble and debris on building sites and other industrial sites whilst carrying out work such as demolition work, tunnelling and mining. A much more efficient means of removing rubble than doing it manually, these 3m conveyor sections can be set up in a long line, at all kinds of angles, to create a convenient rubble conveyor belt running straight from the demolition site to a skip. Built to withstand the tough on-site environment, these robust and durable conveyor sections are perfect for large scale demolitions, providing reliable, powerful performance throughout the job.
Please note: This product description and detail is based on the model we have the most stock of. Alternative brands of equivalent specification may be supplied based on location and availability.
Specification
| Section Lengths | 3m |
| Use Safety Boots | Use Safety Gloves. |
| Use Safety Helmet | Vertical Lifting Only. |
Reviews
There are no reviews for this product yet.
Related Hires
Write a review for "Maxiveyor - 3m"
From 1st April 2022, our suppliers will only fuel machines with white diesel. This is due to new government guidelines.
If you, as the hirer, refuel any equipment while it is in your possession, it must be with WHITE DIESEL.
YOU MUST NOT USE RED DIESEL IN HIRED MACHINES OR EQUIPMENT.
If you return a machine refuelled with rebated diesel, suppliers will have to remove and dispose of the fuel. They must also flush the tank and supply lines before they can refuel them. The process is chargeable, with no exceptions.
Hire Shield is a subrogation waiver covering the first £50 (Standard) or £200 (Premium) of the £1,700 hired-in plant claim excess. It is included in every booking. The charge is calculated at checkout.
If you have your own Hired-In Plant Insurance (HIPI), you'll be asked to provide proof after booking. To opt out of Hire Shield, contact us via .